Union Concrete’s rehabilitation of Runway 5-23 at Buffalo Niagara International Airport extended beyond the reconstruction of the airfield pavement. The project incorporated specialized structural work on tunnel infrastructure beneath the runway, requiring careful coordination between below-grade construction and the extensive runway improvements above. Combined with the large-scale pavement reconstruction, this work added another layer of complexity to an already demanding project performed within an active international airport.