Relocation of 36″ Water Main – Transit Road

The New York State Department of Transportation is building a new bridge for Transit Road over Cazenovia Creek in Elma, New York. This project required relocating an existing 36″ waterline.
Project Overview

The New York State Department of Transportation is building a new bridge for Transit Road over Cazenovia Creek in Elma, New York. This project required relocating an existing 36″ Prestressed Concrete Pressure Pipe (PCCP) waterline. The NYSDOT chose 36″ TR Flex® boltless restrained joint Ductile iron for the 1,300-foot-long new waterline, which included both vertical and horizontal bends. This transmission line relocation included installing 36″ DI pipe under Cazenovia Creek and up a solid rock embankment on both sides of the creek. The DI pipe was anchored to the rock barrier and encased in concrete to secure the installation.