These bridge decks required additional TLC with portions requiring full depth repairs replacing reinforcement, partial removal and replacement of barriers, headers, backwalls and cheek walls, as well as replacing the strip seal joints. The structures also received fascia repairs, concrete overlays and localized steel painting.