$2,638,635.00
March 31st, 2025
West Valley spillway repair involves structural reinforcement of the Lake 1 spillway at the West Valley Demonstration Project (WVDP) site (West Valley, NY) with concrete and shoreline protection, a project managed by the US Army Corps of Engineers (USACE Buffalo District) as part of ongoing site decommissioning. Key work includes installing a reinforced concrete spillway over the earthen structure, adding stone armoring to the shoreline, and related construction like excavation, fill, and drainage, Union Concrete was hired as a sub-contractor to Laubacker Enterprises, Inc. for some of these critical infrastructure upgrades.