Replacement of Bailey Avenue Bridges over Cazenovia Creek and Buffalo River

Project Owner

Ciy of Buffalo (COB)

Completion Year

2019

Contract Value

$18,958,458

Project Award

7/11/2016

Project Overview

A 6-Phase Contract

Union Concrete completed a 6-Phase contract constructing two new bridges over the Buffalo River and Cazenovia Creek, realigning of the roadway (2 lanes either direction) and associated utilities, demolition and pocket park restoration at the existing structures’ site, necessitating several traffic pattern changes. The contract outlined liquidated damages for contract completion and opening of bridges to traffic.

project highlights

Key project highlights preformed.

Brr!!!
These bridges required very large foundations. Union Concrete crews worked through the winter ensuring a successful schedule.
High Water
Minimal work could be done at certain times due to high water levels.
Thomas F. Higgins Natural Habitat Park
The Bailey Peninsula was renamed as a park once the bridges were demolished and the area was landscaped.