$2,723,689
5/11/22
Union Concrete completed the replacement of the South Lyon Street Bridge over Tonawanda Creek in the City of Batavia, replacing an aging single-lane temporary structure with a modern two-lane steel truss bridge. The new structure utilizes a modified Warren pony truss design with hot-dip galvanized structural steel selected to provide exceptional corrosion resistance and minimize long-term maintenance. The project also incorporated a dedicated pedestrian sidewalk, new bridge foundations, roadway realignment, and reconstruction of the approaches, restoring an important connection between residential areas and Batavia’s West Main Street commercial district.
