$380,691
2017
Union Concrete completed major waterfront improvements at Buffalo State’s Great Lakes Center Field Station along the Black Rock Canal. The project replaced the existing shallow boat launch with a deeper, steeper reinforced concrete ramp capable of accommodating larger research vessels during low-water conditions. Work also included rehabilitation of the existing dock, installation of a new floating dock, construction of an improved shoreline revetment, and removal of deteriorated concrete, steel, tires, old pilings, and other debris from the waterfront. Construction required a steel cofferdam and dewatering operations to allow excavation, reinforcement, and concrete placement below the normal water level.